Jump to content

Scrum Office: Difference between revisions

m
Added link to Scrum Witch
(Added image from DragonSlayr15001)
 
m (Added link to Scrum Witch)
Line 2: Line 2:


=== Attendance of the weekly stand-up is mandatory. ===
=== Attendance of the weekly stand-up is mandatory. ===
The will be enforced by the [[Scrum Witch|Scrum Master]].
38

edits